OnlyFleets Moons
Log in with EVE Online

← DS-LO3 VII - Moon 5

How the floor is calculated

DS-LO3 VII - Moon 5 · DS-LO3 · F-RA63

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 4.49B −52.4M 4.44B 13.32B
Jita split (floor basis) 4.67B −52.4M 4.62B 13.85B
Jita sell 4.84B −52.4M 4.79B 14.38B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
4.32B above the 300.0M floor
Fuel drag
1.1%
52.4M / mo of Magmatic Gas
Yield density
533 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Chromite30.8% 269,458 2,695
Vanadinite28.4% 248,872 2,489
Loparite21.8% 190,880 1,909
Xenotime19.0% 166,790 1,668

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Chromite — 555.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons24,413 44310.8M
Chromium97,651 6k544.6M

Vanadinite — 226.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates22,548 4009.0M
Vanadium90,191 2k217.4M

Loparite — 2.17B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons34,588 44315.3M
Scandium34,588 54718.9M
Platinum17,294 8k130.5M
Promethium38,046 53k2.01B

Xenotime — 1.71B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases30,222 1665.0M
Cobalt30,222 60418.3M
Vanadium15,111 2k36.4M
Dysprosium33,245 50k1.65B

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Promethium38,0462.01B
Dysprosium33,2451.65B
Chromium97,651544.6M
Vanadium105,302253.8M
Platinum17,294130.5M
Hydrocarbons59,00026.1M
Scandium34,58818.9M
Cobalt30,22218.3M
Silicates22,5489.0M
Atmospheric Gases30,2225.0M
Gross4,669,052,044 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross4,669,052,044 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor4,616,696,444 ISK / 30 days
Floor used by the auction 4,616,696,444 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid4,616,696,444 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 13,850,089,332 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.