OnlyFleets Moons
Log in with EVE Online

← K-YI1L I - Moon 1

How the floor is calculated

K-YI1L I - Moon 1 · K-YI1L · 8ET-D1

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 2.39B −52.4M 2.34B 7.02B
Jita split (floor basis) 2.40B −52.4M 2.35B 7.04B
Jita sell 2.41B −52.4M 2.36B 7.07B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
2.05B above the 300.0M floor
Fuel drag
2.2%
52.4M / mo of Magmatic Gas
Yield density
274 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Cobaltite80.5% 705,618 7,056
Monazite19.4% 170,382 1,704

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Cobaltite — 154.5M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt255,716 604154.5M

Monazite — 2.25B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits30,873 2046.3M
Tungsten30,873 1k39.6M
Chromium15,437 6k86.1M
Neodymium33,961 62k2.11B

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Neodymium33,9612.11B
Cobalt255,716154.5M
Chromium15,43786.1M
Tungsten30,87339.6M
Evaporite Deposits30,8736.3M
Gross2,400,151,590 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross2,400,151,590 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor2,347,795,990 ISK / 30 days
Floor used by the auction 2,347,795,990 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid2,347,795,990 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 7,043,387,970 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.