OnlyFleets Moons
Log in with EVE Online

← DS-LO3 VIII - Moon 12

How the floor is calculated

DS-LO3 VIII - Moon 12 · DS-LO3 · F-RA63

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 1.22B −52.4M 1.17B 3.51B
Jita split (floor basis) 1.25B −52.4M 1.19B 3.58B
Jita sell 1.27B −52.4M 1.22B 3.66B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
894.7M above the 300.0M floor
Fuel drag
4.2%
52.4M / mo of Magmatic Gas
Yield density
142 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Bitumens33.4% 292,526 2,925
Zeolites31.2% 273,252 2,733
Chromite24.5% 214,641 2,146
Cobaltite10.9% 95,581 956

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Bitumens — 386.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite15,901,694 16258.8M
Mexallon1,060,113 4951.5M
Hydrocarbons172,268 44376.3M

Zeolites — 397.1M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite19,805,285 16322.3M
Mexallon990,264 4948.1M
Atmospheric Gases160,918 16626.7M

Chromite — 442.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons19,447 4438.6M
Chromium77,786 6k433.8M

Cobaltite — 20.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt34,639 60420.9M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite35,706,980581.1M
Chromium77,786433.8M
Mexallon2,050,37799.7M
Hydrocarbons191,71584.9M
Atmospheric Gases160,91826.7M
Cobalt34,63920.9M
Gross1,247,019,491 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross1,247,019,491 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor1,194,663,891 ISK / 30 days
Floor used by the auction 1,194,663,891 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid1,194,663,891 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 3,583,991,674 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.