OnlyFleets Moons
Log in with EVE Online

← 9ES-SI V - Moon 17

How the floor is calculated

9ES-SI V - Moon 17 · 9ES-SI · YB7B-8

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 779.0M −52.4M 726.6M 2.18B
Jita split (floor basis) 1.02B −52.4M 968.7M 2.91B
Jita sell 1.26B −52.4M 1.21B 3.63B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
668.7M above the 300.0M floor
Fuel drag
5.1%
52.4M / mo of Magmatic Gas
Yield density
117 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Coesite32.7% 286,166 2,862
Chromite31.9% 279,165 2,792
Otavite24.8% 217,031 2,170
Cobaltite10.7% 93,638 936

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Coesite — 202.2M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite5,185,325 1684.4M
Mexallon1,037,065 4950.4M
Silicates168,523 40067.4M

Chromite — 575.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons25,292 44311.2M
Chromium101,169 6k564.2M

Otavite — 223.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases19,663 1663.3M
Cadmium78,652 3k219.7M

Cobaltite — 20.5M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt33,935 60420.5M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Chromium101,169564.2M
Cadmium78,652219.7M
Pyerite5,185,32584.4M
Silicates168,52367.4M
Mexallon1,037,06550.4M
Cobalt33,93520.5M
Hydrocarbons25,29211.2M
Atmospheric Gases19,6633.3M
Gross1,021,039,202 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross1,021,039,202 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor968,683,602 ISK / 30 days
Floor used by the auction 968,683,602 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid968,683,602 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,906,050,806 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.

No auction open right now.