OnlyFleets Moons
Log in with EVE Online

← 8QT-H4 IX - Moon 12

How the floor is calculated

8QT-H4 IX - Moon 12 · 8QT-H4 · MPJW-6

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 1.22B −52.4M 1.17B 3.50B
Jita split (floor basis) 1.25B −52.4M 1.20B 3.59B
Jita sell 1.28B −52.4M 1.23B 3.69B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
897.8M above the 300.0M floor
Fuel drag
4.2%
52.4M / mo of Magmatic Gas
Yield density
143 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Bitumens33.5% 293,840 2,938
Vanadinite31.2% 273,515 2,735
Sperrylite24.6% 215,255 2,153
Cobaltite10.7% 93,391 934

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Bitumens — 388.3M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite15,973,131 16260.0M
Mexallon1,064,875 4951.8M
Hydrocarbons173,042 44376.6M

Vanadinite — 248.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates24,780 4009.9M
Vanadium99,122 2k238.9M

Sperrylite — 592.5M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits19,502 2044.0M
Platinum78,008 8k588.5M

Cobaltite — 20.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt33,845 60420.4M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Platinum78,008588.5M
Pyerite15,973,131260.0M
Vanadium99,122238.9M
Hydrocarbons173,04276.6M
Mexallon1,064,87551.8M
Cobalt33,84520.4M
Silicates24,7809.9M
Evaporite Deposits19,5024.0M
Gross1,250,133,249 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross1,250,133,249 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor1,197,777,649 ISK / 30 days
Floor used by the auction 1,197,777,649 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid1,197,777,649 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 3,593,332,946 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.