OnlyFleets Moons
Log in with EVE Online

← M1BZ-2 V - Moon 2

How the floor is calculated

M1BZ-2 V - Moon 2 · M1BZ-2 · MPJW-6

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 2.31B −52.4M 2.26B 6.77B
Jita split (floor basis) 2.33B −52.4M 2.28B 6.84B
Jita sell 2.35B −52.4M 2.30B 6.91B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
1.98B above the 300.0M floor
Fuel drag
2.2%
52.4M / mo of Magmatic Gas
Yield density
266 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Vanadinite52.5% 460,338 4,603
Cobaltite31.4% 275,064 2,751
Monazite16.0% 140,598 1,406

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Vanadinite — 418.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates41,707 40016.7M
Vanadium166,826 2k402.1M

Cobaltite — 60.2M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt99,683 60460.2M

Monazite — 1.85B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits25,476 2045.2M
Tungsten25,476 1k32.6M
Chromium12,738 6k71.0M
Neodymium28,024 62k1.74B

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Neodymium28,0241.74B
Vanadium166,826402.1M
Chromium12,73871.0M
Cobalt99,68360.2M
Tungsten25,47632.6M
Silicates41,70716.7M
Evaporite Deposits25,4765.2M
Gross2,332,140,457 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross2,332,140,457 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor2,279,784,857 ISK / 30 days
Floor used by the auction 2,279,784,857 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid2,279,784,857 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 6,839,354,572 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 17 min ago. Every input is on the settings page.

No auction open right now.