← 49-U6U VI - Moon 4
How the floor is calculated
49-U6U VI - Moon 4 · 49-U6U · MPJW-6
The floor is what the alliance would earn by dropping a Metenox
on this moon — the passive income active miners have to beat. The chain:
monthly ore units → split by composition → reprocess (× refine yield)
→ value materials at Jita split → gross
− Magmatic Gas fuel = floor
Value at each Jita price
| Basis | Mined value / mo | − fuel |
Net / mo | Per 3-mo term |
| Jita buy |
1.15B |
−52.4M |
1.10B |
3.29B |
| Jita split (floor basis) |
1.18B |
−52.4M |
1.12B |
3.37B |
| Jita sell |
1.20B |
−52.4M |
1.15B |
3.46B |
Jita sell is the optimistic ceiling (you fill your own sell orders);
Jita buy the floor (dump everything to buy orders); split
the midpoint the auction floor uses.
Viability
viable
824.8M above the 300.0M floor
Fuel drag
4.4%
52.4M / mo of Magmatic Gas
Yield density
134 / m³
8,760,000 m³ mined / 30 days
| Base moon extraction | 30,000 | m³ / hour (game constant) |
| Metenox efficiency | 40% | of a manually worked Athanor/Tatara |
| Hours / month | 730 | 730 = 365 × 24 ÷ 12 |
| Moon ore volume | 10 | m³ / unit |
| Refine yield (max skills + structure) | 90.6% | of the theoretical 100% reprocessing result |
| Magmatic Gas burn | 40 | units / hour → 29,200 / 30 days |
| Material prices | Jita split | buy/sell midpoint if "split" |
| Magmatic Gas price | 2k | Jita sell, per unit |
Step 0 — how much a Metenox pulls in 30 days
30,000 m³/hr × 40% × 730 hr
= 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days
Step 1 — split the monthly ore by composition
| Ore | Share | Units / 30 days | = portions (÷100) |
| Zeolites | 33.4% |
292,234 |
2,922 |
| Chromite | 32.1% |
281,284 |
2,813 |
| Coesite | 24.9% |
218,474 |
2,185 |
| Cobaltite | 9.6% |
84,008 |
840 |
Step 2 & 3 — reprocess each ore, then value the materials
per material:
portions × SDE yield × 90.6% × Jita split price
Zeolites — 424.7M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Pyerite | 21,181,091 |
16 | 344.7M |
| Mexallon | 1,059,055 |
49 | 51.5M |
| Atmospheric Gases | 172,096 |
166 | 28.5M |
Chromite — 579.7M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Hydrocarbons | 25,484 |
443 | 11.3M |
| Chromium | 101,937 |
6k | 568.5M |
Coesite — 154.4M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Pyerite | 3,958,756 |
16 | 64.4M |
| Mexallon | 791,751 |
49 | 38.5M |
| Silicates | 128,660 |
400 | 51.5M |
Cobaltite — 18.4M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Cobalt | 30,445 |
604 | 18.4M |
Step 4 — gross
| Refined material (all ores) | Units / 30 days | ISK / 30 days |
| Chromium | 101,937 | 568.5M |
| Pyerite | 25,139,847 | 409.2M |
| Mexallon | 1,850,806 | 90.0M |
| Silicates | 128,660 | 51.5M |
| Atmospheric Gases | 172,096 | 28.5M |
| Cobalt | 30,445 | 18.4M |
| Hydrocarbons | 25,484 | 11.3M |
| Gross | 1,177,203,834 ISK |
Step 5 — Magmatic Gas fuel
40 / hr × 730 hr
= 29,200 units × 2k
= 52,355,600 ISK / 30 days
Step 6 — floor
| Gross | 1,177,203,834 ISK |
| − Magmatic Gas fuel | −52,355,600 ISK |
| Model floor | 1,124,848,234 ISK / 30 days |
| Floor used by the auction |
1,124,848,234 ISK / month |
Step 7 — what a bidder pays
| Term length | 3 months |
| Minimum monthly bid | 1,124,848,234 ISK (the floor) |
| Prepaid to the alliance on winning |
bid × 3 — at the floor, 3,374,544,702 ISK |
| Viability floor |
300,000,000 ISK / month —
clears it
|
From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita,
16 min ago. Every input is on the settings page.
No auction open right now.