OnlyFleets Moons
Log in with EVE Online

← ED-L9T IV - Moon 1

How the floor is calculated

ED-L9T IV - Moon 1 · ED-L9T · LI-BA0

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 562.3M −52.4M 509.9M 1.53B
Jita split (floor basis) 868.0M −52.4M 815.6M 2.45B
Jita sell 1.17B −52.4M 1.12B 3.36B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
515.6M above the 300.0M floor
Fuel drag
6.0%
52.4M / mo of Magmatic Gas
Yield density
99 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Otavite33.4% 292,701 2,927
Sylvite28.8% 252,313 2,523
Bitumens28.1% 245,918 2,459
Cobaltite9.7% 85,068 851

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Otavite — 300.7M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases26,519 1664.4M
Cadmium106,075 3k296.3M

Sylvite — 223.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite9,143,832 16148.8M
Mexallon914,383 4944.4M
Evaporite Deposits148,587 20430.4M

Bitumens — 325.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite13,368,091 16217.6M
Mexallon891,206 4943.3M
Hydrocarbons144,821 44364.1M

Cobaltite — 18.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt30,829 60418.6M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite22,511,923366.4M
Cadmium106,075296.3M
Mexallon1,805,58987.8M
Hydrocarbons144,82164.1M
Evaporite Deposits148,58730.4M
Cobalt30,82918.6M
Atmospheric Gases26,5194.4M
Gross867,971,226 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross867,971,226 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor815,615,626 ISK / 30 days
Floor used by the auction 815,615,626 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid815,615,626 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,446,846,877 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.