OnlyFleets Moons
Log in with EVE Online

← H74-B0 IV - Moon 4

How the floor is calculated

H74-B0 IV - Moon 4 · H74-B0 · XLL-Z7

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 2.06B −52.4M 2.01B 6.03B
Jita split (floor basis) 2.07B −52.4M 2.02B 6.06B
Jita sell 2.08B −52.4M 2.03B 6.08B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
1.72B above the 300.0M floor
Fuel drag
2.5%
52.4M / mo of Magmatic Gas
Yield density
236 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Cobaltite83.5% 731,036 7,310
Monazite16.5% 144,964 1,450

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Cobaltite — 160.1M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt264,928 604160.1M

Monazite — 1.91B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits26,267 2045.4M
Tungsten26,267 1k33.7M
Chromium13,134 6k73.2M
Neodymium28,894 62k1.80B

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Neodymium28,8941.80B
Cobalt264,928160.1M
Chromium13,13473.2M
Tungsten26,26733.7M
Evaporite Deposits26,2675.4M
Gross2,070,701,381 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross2,070,701,381 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor2,018,345,781 ISK / 30 days
Floor used by the auction 2,018,345,781 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid2,018,345,781 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 6,055,037,342 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.

No auction open right now.