OnlyFleets Moons
Log in with EVE Online

← 4-2UXV VI - Moon 17

How the floor is calculated

4-2UXV VI - Moon 17 · 4-2UXV · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 798.5M −52.4M 746.2M 2.24B
Jita split (floor basis) 818.3M −52.4M 766.0M 2.30B
Jita sell 838.1M −52.4M 785.8M 2.36B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
466.0M above the 300.0M floor
Fuel drag
6.4%
52.4M / mo of Magmatic Gas
Yield density
93 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Vanadinite33.1% 290,219 2,902
Sylvite28.8% 252,638 2,526
Bitumens26.7% 233,454 2,335
Cobaltite11.4% 99,689 997

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Vanadinite — 264.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates26,294 40010.5M
Vanadium105,175 2k253.5M

Sylvite — 223.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite9,155,616 16149.0M
Mexallon915,562 4944.5M
Evaporite Deposits148,779 20430.4M

Bitumens — 308.5M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite12,690,559 16206.5M
Mexallon846,037 4941.1M
Hydrocarbons137,481 44360.9M

Cobaltite — 21.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt36,127 60421.8M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite21,846,175355.5M
Vanadium105,175253.5M
Mexallon1,761,59985.6M
Hydrocarbons137,48160.9M
Evaporite Deposits148,77930.4M
Cobalt36,12721.8M
Silicates26,29410.5M
Gross818,310,393 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross818,310,393 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor765,954,793 ISK / 30 days
Floor used by the auction 765,954,793 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid765,954,793 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,297,864,379 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.