OnlyFleets Moons
Log in with EVE Online

← 60M-TG VIII - Moon 2

How the floor is calculated

60M-TG VIII - Moon 2 · 60M-TG · YB7B-8

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 946.6M −52.4M 894.3M 2.68B
Jita split (floor basis) 973.6M −52.4M 921.3M 2.76B
Jita sell 1.00B −52.4M 948.2M 2.84B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
621.3M above the 300.0M floor
Fuel drag
5.4%
52.4M / mo of Magmatic Gas
Yield density
111 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Coesite59.5% 521,220 5,212
Chromite32.7% 286,452 2,865
Cobaltite7.8% 68,328 683

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Coesite — 368.3M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite9,444,506 16153.7M
Mexallon1,888,901 4991.8M
Silicates306,946 400122.7M

Chromite — 590.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons25,953 44311.5M
Chromium103,810 6k578.9M

Cobaltite — 15.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt24,762 60415.0M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Chromium103,810578.9M
Pyerite9,444,506153.7M
Silicates306,946122.7M
Mexallon1,888,90191.8M
Cobalt24,76215.0M
Hydrocarbons25,95311.5M
Gross973,622,228 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross973,622,228 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor921,266,628 ISK / 30 days
Floor used by the auction 921,266,628 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid921,266,628 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,763,799,885 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.