OnlyFleets Moons
Log in with EVE Online

← E-VKJV VII - Moon 4

How the floor is calculated

E-VKJV VII - Moon 4 · E-VKJV · 4QZ-2M

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 960.9M −52.4M 908.5M 2.73B
Jita split (floor basis) 992.1M −52.4M 939.8M 2.82B
Jita sell 1.02B −52.4M 971.1M 2.91B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
639.8M above the 300.0M floor
Fuel drag
5.3%
52.4M / mo of Magmatic Gas
Yield density
113 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Vanadinite35.4% 309,841 3,098
Chromite29.4% 257,982 2,580
Coesite26.0% 227,760 2,278
Cobaltite9.2% 80,417 804

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Vanadinite — 281.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates28,072 40011.2M
Vanadium112,286 2k270.7M

Chromite — 531.7M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons23,373 44310.3M
Chromium93,493 6k521.4M

Coesite — 160.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite4,127,011 1667.2M
Mexallon825,402 4940.1M
Silicates134,128 40053.6M

Cobaltite — 17.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt29,143 60417.6M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Chromium93,493521.4M
Vanadium112,286270.7M
Pyerite4,127,01167.2M
Silicates162,19964.9M
Mexallon825,40240.1M
Cobalt29,14317.6M
Hydrocarbons23,37310.3M
Gross992,134,789 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross992,134,789 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor939,779,189 ISK / 30 days
Floor used by the auction 939,779,189 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid939,779,189 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,819,337,567 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.

No auction open right now.