OnlyFleets Moons
Log in with EVE Online

← B-7DFU III - Moon 1

How the floor is calculated

B-7DFU III - Moon 1 · B-7DFU · 4QZ-2M

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 5.50B −52.4M 5.45B 16.35B
Jita split (floor basis) 5.52B −52.4M 5.47B 16.41B
Jita sell 5.54B −52.4M 5.49B 16.46B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
5.17B above the 300.0M floor
Fuel drag
0.9%
52.4M / mo of Magmatic Gas
Yield density
630 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Monazite45.7% 400,157 4,002
Coesite33.4% 292,409 2,924
Cobaltite20.9% 183,434 1,834

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Monazite — 5.27B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits72,508 20414.8M
Tungsten72,508 1k92.9M
Chromium36,254 6k202.2M
Neodymium79,759 62k4.96B

Coesite — 206.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite5,298,447 1686.2M
Mexallon1,059,689 4951.5M
Silicates172,200 40068.9M

Cobaltite — 40.2M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt66,477 60440.2M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Neodymium79,7594.96B
Chromium36,254202.2M
Tungsten72,50892.9M
Pyerite5,298,44786.2M
Silicates172,20068.9M
Mexallon1,059,68951.5M
Cobalt66,47740.2M
Evaporite Deposits72,50814.8M
Gross5,520,895,949 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross5,520,895,949 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor5,468,540,349 ISK / 30 days
Floor used by the auction 5,468,540,349 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid5,468,540,349 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 16,405,621,048 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.