OnlyFleets Moons
Log in with EVE Online

← P4-3TJ VIII - Moon 23

How the floor is calculated

P4-3TJ VIII - Moon 23 · P4-3TJ · 9NP-KR

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 2.20B −52.4M 2.15B 6.45B
Jita split (floor basis) 2.27B −52.4M 2.22B 6.66B
Jita sell 2.34B −52.4M 2.29B 6.87B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
1.92B above the 300.0M floor
Fuel drag
2.3%
52.4M / mo of Magmatic Gas
Yield density
259 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Carnotite32.6% 285,635 2,856
Cinnabar29.8% 260,934 2,609
Coesite19.6% 171,591 1,716
Cobaltite18.0% 157,839 1,578

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Carnotite — 1.65B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases38,818 1666.4M
Cobalt25,879 60415.6M
Technetium129,393 13k1.63B

Cinnabar — 465.7M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits35,461 2047.2M
Tungsten23,641 1k30.3M
Mercury118,203 4k428.1M

Coesite — 121.2M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite3,109,233 1650.6M
Mexallon621,847 4930.2M
Silicates101,050 40040.4M

Cobaltite — 34.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt57,201 60434.6M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Technetium129,3931.63B
Mercury118,203428.1M
Pyerite3,109,23350.6M
Cobalt83,08050.2M
Silicates101,05040.4M
Tungsten23,64130.3M
Mexallon621,84730.2M
Evaporite Deposits35,4617.2M
Atmospheric Gases38,8186.4M
Gross2,271,945,961 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross2,271,945,961 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor2,219,590,361 ISK / 30 days
Floor used by the auction 2,219,590,361 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid2,219,590,361 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 6,658,771,082 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 15 min ago. Every input is on the settings page.

No auction open right now.