OnlyFleets Moons
Log in with EVE Online

← 4-2UXV VII - Moon 5

How the floor is calculated

4-2UXV VII - Moon 5 · 4-2UXV · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 957.0M −52.4M 904.6M 2.71B
Jita split (floor basis) 976.8M −52.4M 924.5M 2.77B
Jita sell 996.7M −52.4M 944.3M 2.83B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
624.5M above the 300.0M floor
Fuel drag
5.4%
52.4M / mo of Magmatic Gas
Yield density
112 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Bitumens57.2% 500,822 5,008
Cobaltite28.4% 248,784 2,488
Chromite14.4% 126,394 1,264

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Bitumens — 661.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite27,224,668 16443.1M
Mexallon1,814,978 4988.2M
Hydrocarbons294,934 443130.6M

Cobaltite — 54.5M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt90,159 60454.5M

Chromite — 260.5M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons11,451 4435.1M
Chromium45,805 6k255.4M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite27,224,668443.1M
Chromium45,805255.4M
Hydrocarbons306,385135.6M
Mexallon1,814,97888.2M
Cobalt90,15954.5M
Gross976,831,924 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross976,831,924 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor924,476,324 ISK / 30 days
Floor used by the auction 924,476,324 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid924,476,324 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,773,428,973 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.

No auction open right now.