OnlyFleets Moons
Log in with EVE Online

← 8-GE2P VI - Moon 14

How the floor is calculated

8-GE2P VI - Moon 14 · 8-GE2P · 8ET-D1

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 870.5M −52.4M 818.1M 2.45B
Jita split (floor basis) 892.0M −52.4M 839.6M 2.52B
Jita sell 913.5M −52.4M 861.1M 2.58B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
539.6M above the 300.0M floor
Fuel drag
5.9%
52.4M / mo of Magmatic Gas
Yield density
102 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Vanadinite36.9% 323,025 3,230
Sylvite34.8% 304,848 3,048
Bitumens28.3% 248,127 2,481

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Vanadinite — 293.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates29,266 40011.7M
Vanadium117,064 2k282.2M

Sylvite — 270.2M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite11,047,692 16179.8M
Mexallon1,104,769 4953.7M
Evaporite Deposits179,525 20436.7M

Bitumens — 327.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite13,488,184 16219.5M
Mexallon899,212 4943.7M
Hydrocarbons146,122 44364.7M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite24,535,875399.3M
Vanadium117,064282.2M
Mexallon2,003,98197.4M
Hydrocarbons146,12264.7M
Evaporite Deposits179,52536.7M
Silicates29,26611.7M
Gross891,997,610 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross891,997,610 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor839,642,010 ISK / 30 days
Floor used by the auction 839,642,010 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid839,642,010 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,518,926,030 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 17 min ago. Every input is on the settings page.

No auction open right now.