How the floor is calculated
8B-SAJ VI - Moon 19 · 8B-SAJ · 9NP-KR
The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:
monthly ore units → split by composition → reprocess (× refine yield) → value materials at Jita split → gross − Magmatic Gas fuel = floor
Value at each Jita price
| Basis | Mined value / mo | − fuel | Net / mo | Per 3-mo term |
|---|---|---|---|---|
| Jita buy | 818.6M | −52.4M | 766.2M | 2.30B |
| Jita split (floor basis) | 840.4M | −52.4M | 788.0M | 2.36B |
| Jita sell | 862.2M | −52.4M | 809.8M | 2.43B |
Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.
Inputs · from settings
| Base moon extraction | 30,000 | m³ / hour (game constant) |
| Metenox efficiency | 40% | of a manually worked Athanor/Tatara |
| Hours / month | 730 | 730 = 365 × 24 ÷ 12 |
| Moon ore volume | 10 | m³ / unit |
| Refine yield (max skills + structure) | 90.6% | of the theoretical 100% reprocessing result |
| Magmatic Gas burn | 40 | units / hour → 29,200 / 30 days |
| Material prices | Jita split | buy/sell midpoint if "split" |
| Magmatic Gas price | 2k | Jita sell, per unit |
Step 0 — how much a Metenox pulls in 30 days
30,000 m³/hr × 40% × 730 hr
= 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days
Step 1 — split the monthly ore by composition
| Ore | Share | Units / 30 days | = portions (÷100) |
|---|---|---|---|
| Coesite | 41.8% | 366,232 | 3,662 |
| Vanadinite | 33.4% | 292,985 | 2,930 |
| Zeolites | 24.7% | 216,783 | 2,168 |
Step 2 & 3 — reprocess each ore, then value the materials
per material: portions × SDE yield × 90.6% × Jita split price
Coesite — 258.8M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
|---|---|---|---|
| Pyerite | 6,636,119 | 16 | 108.0M |
| Mexallon | 1,327,224 | 49 | 64.5M |
| Silicates | 215,674 | 400 | 86.2M |
Vanadinite — 266.6M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
|---|---|---|---|
| Silicates | 26,544 | 400 | 10.6M |
| Vanadium | 106,178 | 2k | 255.9M |
Zeolites — 315.1M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
|---|---|---|---|
| Pyerite | 15,712,425 | 16 | 255.7M |
| Mexallon | 785,621 | 49 | 38.2M |
| Atmospheric Gases | 127,663 | 166 | 21.1M |
Step 4 — gross
| Refined material (all ores) | Units / 30 days | ISK / 30 days |
|---|---|---|
| Pyerite | 22,348,544 | 363.7M |
| Vanadium | 106,178 | 255.9M |
| Mexallon | 2,112,845 | 102.7M |
| Silicates | 242,218 | 96.9M |
| Atmospheric Gases | 127,663 | 21.1M |
| Gross | 840,380,334 ISK | |
Step 5 — Magmatic Gas fuel
40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days
Step 6 — floor
| Gross | 840,380,334 ISK |
| − Magmatic Gas fuel | −52,355,600 ISK |
| Model floor | 788,024,734 ISK / 30 days |
| Floor used by the auction | 788,024,734 ISK / month |
Step 7 — what a bidder pays
| Term length | 3 months |
| Minimum monthly bid | 788,024,734 ISK (the floor) |
| Prepaid to the alliance on winning | bid × 3 — at the floor, 2,364,074,201 ISK |
| Viability floor | 300,000,000 ISK / month — clears it |
From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.
No auction open right now.