How the floor is calculated

DG-L7S VII - Moon 11 · DG-L7S · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 811.4M −52.4M 759.1M 2.28B
Jita split (floor basis) 837.6M −52.4M 785.3M 2.36B
Jita sell 863.9M −52.4M 811.5M 2.43B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
485.3M above the 300.0M floor
Fuel drag
6.3%
52.4M / mo of Magmatic Gas
Yield density
96 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Vanadinite36.1% 316,466 3,165
Cobaltite32.7% 286,679 2,867
Cinnabar31.1% 272,856 2,729

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Vanadinite — 287.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates28,672 40011.5M
Vanadium114,687 2k276.5M

Cobaltite — 62.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt103,892 60462.8M

Cinnabar — 487.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits37,081 2047.6M
Tungsten24,721 1k31.7M
Mercury123,604 4k447.7M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Mercury123,604447.7M
Vanadium114,687276.5M
Cobalt103,89262.8M
Tungsten24,72131.7M
Silicates28,67211.5M
Evaporite Deposits37,0817.6M
Gross837,637,174 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross837,637,174 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor785,281,574 ISK / 30 days
Floor used by the auction 785,281,574 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid785,281,574 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,355,844,721 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.