OnlyFleets Moons
Log in with EVE Online

← F2OY-X II - Moon 1

How the floor is calculated

F2OY-X II - Moon 1 · F2OY-X · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 759.2M −52.4M 706.9M 2.12B
Jita split (floor basis) 775.6M −52.4M 723.3M 2.17B
Jita sell 792.0M −52.4M 739.7M 2.22B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
423.3M above the 300.0M floor
Fuel drag
6.8%
52.4M / mo of Magmatic Gas
Yield density
89 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Sylvite56.2% 492,062 4,921
Cobaltite28.0% 245,280 2,453
Chromite15.8% 138,658 1,387

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Sylvite — 436.1M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite17,832,317 16290.2M
Mexallon1,783,232 4986.7M
Evaporite Deposits289,775 20459.2M

Cobaltite — 53.7M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt88,889 60453.7M

Chromite — 285.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons12,562 4435.6M
Chromium50,250 6k280.2M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite17,832,317290.2M
Chromium50,250280.2M
Mexallon1,783,23286.7M
Evaporite Deposits289,77559.2M
Cobalt88,88953.7M
Hydrocarbons12,5625.6M
Gross775,615,022 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross775,615,022 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor723,259,422 ISK / 30 days
Floor used by the auction 723,259,422 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid723,259,422 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,169,778,267 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.

No auction open right now.