How the floor is calculated

3BK-O7 II - Moon 1 · 3BK-O7 · 8ET-D1

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 807.6M −52.4M 755.2M 2.27B
Jita split (floor basis) 825.2M −52.4M 772.9M 2.32B
Jita sell 842.8M −52.4M 790.5M 2.37B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
472.9M above the 300.0M floor
Fuel drag
6.3%
52.4M / mo of Magmatic Gas
Yield density
94 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Bitumens54.0% 473,415 4,734
Cobaltite27.5% 241,275 2,413
Vanadinite18.4% 161,309 1,613

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Bitumens — 625.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite25,734,863 16418.8M
Mexallon1,715,658 4983.4M
Hydrocarbons278,794 443123.4M

Cobaltite — 52.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt87,438 60452.8M

Vanadinite — 146.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates14,615 4005.8M
Vanadium58,458 2k140.9M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite25,734,863418.8M
Vanadium58,458140.9M
Hydrocarbons278,794123.4M
Mexallon1,715,65883.4M
Cobalt87,43852.8M
Silicates14,6155.8M
Gross825,225,553 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross825,225,553 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor772,869,953 ISK / 30 days
Floor used by the auction 772,869,953 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid772,869,953 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,318,609,858 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.