OnlyFleets Moons
Log in with EVE Online

← F2OY-X V - Moon 1

How the floor is calculated

F2OY-X V - Moon 1 · F2OY-X · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 777.4M −52.4M 725.0M 2.18B
Jita split (floor basis) 793.8M −52.4M 741.5M 2.22B
Jita sell 810.3M −52.4M 757.9M 2.27B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
441.5M above the 300.0M floor
Fuel drag
6.6%
52.4M / mo of Magmatic Gas
Yield density
91 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Bitumens53.2% 466,032 4,660
Cobaltite32.2% 282,322 2,823
Vanadinite14.6% 127,646 1,276

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Bitumens — 615.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite25,333,500 16412.3M
Mexallon1,688,900 4982.1M
Hydrocarbons274,446 443121.5M

Cobaltite — 61.8M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt102,314 60461.8M

Vanadinite — 116.1M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Silicates11,565 4004.6M
Vanadium46,259 2k111.5M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Pyerite25,333,500412.3M
Hydrocarbons274,446121.5M
Vanadium46,259111.5M
Mexallon1,688,90082.1M
Cobalt102,31461.8M
Silicates11,5654.6M
Gross793,828,100 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross793,828,100 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor741,472,500 ISK / 30 days
Floor used by the auction 741,472,500 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid741,472,500 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,224,417,499 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.