OnlyFleets Moons
Log in with EVE Online

← 4-2UXV VI - Moon 16

How the floor is calculated

4-2UXV VI - Moon 16 · 4-2UXV · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 739.5M −52.4M 687.2M 2.06B
Jita split (floor basis) 758.5M −52.4M 706.2M 2.12B
Jita sell 777.5M −52.4M 725.2M 2.18B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
406.2M above the 300.0M floor
Fuel drag
6.9%
52.4M / mo of Magmatic Gas
Yield density
87 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Coesite59.1% 517,841 5,178
Cobaltite26.7% 234,142 2,341
Sperrylite14.2% 124,017 1,240

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Coesite — 365.9M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite9,383,282 16152.7M
Mexallon1,876,656 4991.2M
Silicates304,957 400122.0M

Cobaltite — 51.3M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Cobalt84,853 60451.3M

Sperrylite — 341.4M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits11,236 2042.3M
Platinum44,944 8k339.1M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Platinum44,944339.1M
Pyerite9,383,282152.7M
Silicates304,957122.0M
Mexallon1,876,65691.2M
Cobalt84,85351.3M
Evaporite Deposits11,2362.3M
Gross758,527,022 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross758,527,022 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor706,171,422 ISK / 30 days
Floor used by the auction 706,171,422 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid706,171,422 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 2,118,514,267 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 18 min ago. Every input is on the settings page.

No auction open right now.