How the floor is calculated
BX2-ZX X - Moon 14 · BX2-ZX · F-RA63
The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:
monthly ore units → split by composition → reprocess (× refine yield) → value materials at Jita split → gross − Magmatic Gas fuel = floor
Value at each Jita price
| Basis | Mined value / mo | − fuel | Net / mo | Per 3-mo term |
|---|---|---|---|---|
| Jita buy | 562.1M | −52.4M | 509.8M | 1.53B |
| Jita split (floor basis) | 574.7M | −52.4M | 522.3M | 1.57B |
| Jita sell | 587.2M | −52.4M | 534.9M | 1.60B |
Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.
Inputs · from settings
| Base moon extraction | 30,000 | m³ / hour (game constant) |
| Metenox efficiency | 40% | of a manually worked Athanor/Tatara |
| Hours / month | 730 | 730 = 365 × 24 ÷ 12 |
| Moon ore volume | 10 | m³ / unit |
| Refine yield (max skills + structure) | 90.6% | of the theoretical 100% reprocessing result |
| Magmatic Gas burn | 40 | units / hour → 29,200 / 30 days |
| Material prices | Jita split | buy/sell midpoint if "split" |
| Magmatic Gas price | 2k | Jita sell, per unit |
Step 0 — how much a Metenox pulls in 30 days
30,000 m³/hr × 40% × 730 hr
= 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days
Step 1 — split the monthly ore by composition
| Ore | Share | Units / 30 days | = portions (÷100) |
|---|---|---|---|
| Sylvite | 50.2% | 439,502 | 4,395 |
| Cobaltite | 35.0% | 306,850 | 3,069 |
| Vanadinite | 14.8% | 129,648 | 1,296 |
Step 2 & 3 — reprocess each ore, then value the materials
per material: portions × SDE yield × 90.6% × Jita split price
Sylvite — 389.5M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
|---|---|---|---|
| Pyerite | 15,927,542 | 16 | 259.2M |
| Mexallon | 1,592,754 | 49 | 77.4M |
| Evaporite Deposits | 258,823 | 204 | 52.9M |
Cobaltite — 67.2M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
|---|---|---|---|
| Cobalt | 111,203 | 604 | 67.2M |
Vanadinite — 118.0M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
|---|---|---|---|
| Silicates | 11,746 | 400 | 4.7M |
| Vanadium | 46,984 | 2k | 113.3M |
Step 4 — gross
| Refined material (all ores) | Units / 30 days | ISK / 30 days |
|---|---|---|
| Pyerite | 15,927,542 | 259.2M |
| Vanadium | 46,984 | 113.3M |
| Mexallon | 1,592,754 | 77.4M |
| Cobalt | 111,203 | 67.2M |
| Evaporite Deposits | 258,823 | 52.9M |
| Silicates | 11,746 | 4.7M |
| Gross | 574,684,128 ISK | |
Step 5 — Magmatic Gas fuel
40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days
Step 6 — floor
| Gross | 574,684,128 ISK |
| − Magmatic Gas fuel | −52,355,600 ISK |
| Model floor | 522,328,528 ISK / 30 days |
| Floor used by the auction | 522,328,528 ISK / month |
Step 7 — what a bidder pays
| Term length | 3 months |
| Minimum monthly bid | 522,328,528 ISK (the floor) |
| Prepaid to the alliance on winning | bid × 3 — at the floor, 1,566,985,585 ISK |
| Viability floor | 300,000,000 ISK / month — clears it |
From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 17 min ago. Every input is on the settings page.
No auction open right now.