OnlyFleets Moons
Log in with EVE Online

← W6V-VM VIII - Moon 13

How the floor is calculated

W6V-VM VIII - Moon 13 · W6V-VM · 8BO-IH

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 1.27B −52.4M 1.21B 3.64B
Jita split (floor basis) 1.50B −52.4M 1.44B 4.33B
Jita sell 1.72B −52.4M 1.67B 5.02B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
1.14B above the 300.0M floor
Fuel drag
3.5%
52.4M / mo of Magmatic Gas
Yield density
171 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Cinnabar33.0% 288,905 2,889
Sperrylite28.1% 245,981 2,460
Otavite22.1% 193,859 1,939
Coesite16.8% 147,256 1,473

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Cinnabar — 515.6M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits39,262 2048.0M
Tungsten26,175 1k33.5M
Mercury130,874 4k474.0M

Sperrylite — 677.1M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits22,286 2044.6M
Platinum89,143 8k672.5M

Otavite — 199.2M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases17,564 1662.9M
Cadmium70,254 3k196.3M

Coesite — 104.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Pyerite2,668,271 1643.4M
Mexallon533,654 4925.9M
Silicates86,719 40034.7M

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Platinum89,143672.5M
Mercury130,874474.0M
Cadmium70,254196.3M
Pyerite2,668,27143.4M
Silicates86,71934.7M
Tungsten26,17533.5M
Mexallon533,65425.9M
Evaporite Deposits61,54812.6M
Atmospheric Gases17,5642.9M
Gross1,495,906,195 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross1,495,906,195 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor1,443,550,595 ISK / 30 days
Floor used by the auction 1,443,550,595 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid1,443,550,595 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 4,330,651,784 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 16 min ago. Every input is on the settings page.

No auction open right now.