OnlyFleets Moons
Log in with EVE Online

← F2OY-X III - Moon 1

How the floor is calculated

F2OY-X III - Moon 1 · F2OY-X · 3B-IWE

The floor is what the alliance would earn by dropping a Metenox on this moon — the passive income active miners have to beat. The chain:

monthly ore units  →  split by composition  →  reprocess (× refine yield)  →  value materials at Jita split  →  gross  −  Magmatic Gas fuel  =  floor

Value at each Jita price

BasisMined value / mo− fuel Net / moPer 3-mo term
Jita buy 4.83B −52.4M 4.78B 14.33B
Jita split (floor basis) 5.16B −52.4M 5.11B 15.32B
Jita sell 5.49B −52.4M 5.43B 16.30B

Jita sell is the optimistic ceiling (you fill your own sell orders); Jita buy the floor (dump everything to buy orders); split the midpoint the auction floor uses.

Viability
viable
4.81B above the 300.0M floor
Fuel drag
1.0%
52.4M / mo of Magmatic Gas
Yield density
589 / m³
8,760,000 m³ mined / 30 days

Inputs · from settings

Base moon extraction30,000m³ / hour (game constant)
Metenox efficiency40%of a manually worked Athanor/Tatara
Hours / month730730 = 365 × 24 ÷ 12
Moon ore volume10m³ / unit
Refine yield (max skills + structure)90.6%of the theoretical 100% reprocessing result
Magmatic Gas burn40units / hour → 29,200 / 30 days
Material pricesJita splitbuy/sell midpoint if "split"
Magmatic Gas price2kJita sell, per unit

Step 0 — how much a Metenox pulls in 30 days

30,000 m³/hr × 40% × 730 hr = 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days

Step 1 — split the monthly ore by composition

OreShareUnits / 30 days= portions (÷100)
Otavite28.4% 248,521 2,485
Chromite28.2% 247,470 2,475
Xenotime24.2% 212,167 2,122
Monazite19.2% 167,842 1,678

Step 2 & 3 — reprocess each ore, then value the materials

per material: portions × SDE yield × 90.6% × Jita split price

Otavite — 255.3M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases22,516 1663.7M
Cadmium90,064 3k251.6M

Chromite — 510.0M / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Hydrocarbons22,421 4439.9M
Chromium89,683 6k500.1M

Xenotime — 2.18B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Atmospheric Gases38,445 1666.4M
Cobalt38,445 60423.2M
Vanadium19,222 2k46.3M
Dysprosium42,289 50k2.10B

Monazite — 2.21B / 30 days

MaterialUnits / 30 daysJita splitISK / 30 days
Evaporite Deposits30,413 2046.2M
Tungsten30,413 1k39.0M
Chromium15,206 6k84.8M
Neodymium33,454 62k2.08B

Step 4 — gross

Refined material (all ores)Units / 30 daysISK / 30 days
Dysprosium42,2892.10B
Neodymium33,4542.08B
Chromium104,890584.9M
Cadmium90,064251.6M
Vanadium19,22246.3M
Tungsten30,41339.0M
Cobalt38,44523.2M
Atmospheric Gases60,96110.1M
Hydrocarbons22,4219.9M
Evaporite Deposits30,4136.2M
Gross5,157,999,760 ISK

Step 5 — Magmatic Gas fuel

40 / hr × 730 hr = 29,200 units × 2k = 52,355,600 ISK / 30 days

Step 6 — floor

Gross5,157,999,760 ISK
− Magmatic Gas fuel−52,355,600 ISK
Model floor5,105,644,160 ISK / 30 days
Floor used by the auction 5,105,644,160 ISK / month

Step 7 — what a bidder pays

Term length3 months
Minimum monthly bid5,105,644,160 ISK (the floor)
Prepaid to the alliance on winning bid × 3 — at the floor, 15,316,932,481 ISK
Viability floor 300,000,000 ISK / month — clears it

From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita, 15 min ago. Every input is on the settings page.

No auction open right now.