← G-3BOG V - Moon 16
How the floor is calculated
G-3BOG V - Moon 16 · G-3BOG · PUB-0R
The floor is what the alliance would earn by dropping a Metenox
on this moon — the passive income active miners have to beat. The chain:
monthly ore units → split by composition → reprocess (× refine yield)
→ value materials at Jita split → gross
− Magmatic Gas fuel = floor
Value at each Jita price
| Basis | Mined value / mo | − fuel |
Net / mo | Per 3-mo term |
| Jita buy |
901.5M |
−52.4M |
849.1M |
2.55B |
| Jita split (floor basis) |
1.18B |
−52.4M |
1.13B |
3.39B |
| Jita sell |
1.46B |
−52.4M |
1.41B |
4.23B |
Jita sell is the optimistic ceiling (you fill your own sell orders);
Jita buy the floor (dump everything to buy orders); split
the midpoint the auction floor uses.
Viability
viable
829.5M above the 300.0M floor
Fuel drag
4.4%
52.4M / mo of Magmatic Gas
Yield density
135 / m³
8,760,000 m³ mined / 30 days
| Base moon extraction | 30,000 | m³ / hour (game constant) |
| Metenox efficiency | 40% | of a manually worked Athanor/Tatara |
| Hours / month | 730 | 730 = 365 × 24 ÷ 12 |
| Moon ore volume | 10 | m³ / unit |
| Refine yield (max skills + structure) | 90.6% | of the theoretical 100% reprocessing result |
| Magmatic Gas burn | 40 | units / hour → 29,200 / 30 days |
| Material prices | Jita split | buy/sell midpoint if "split" |
| Magmatic Gas price | 2k | Jita sell, per unit |
Step 0 — how much a Metenox pulls in 30 days
30,000 m³/hr × 40% × 730 hr
= 8,760,000 m³ of moon ore
÷ 10 m³/unit = 876,000 units of moon ore / 30 days
Step 1 — split the monthly ore by composition
| Ore | Share | Units / 30 days | = portions (÷100) |
| Bitumens | 30.5% |
267,005 |
2,670 |
| Chromite | 30.3% |
265,691 |
2,657 |
| Otavite | 29.1% |
255,091 |
2,551 |
| Cobaltite | 10.1% |
88,213 |
882 |
Step 2 & 3 — reprocess each ore, then value the materials
per material:
portions × SDE yield × 90.6% × Jita split price
Bitumens — 352.9M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Pyerite | 14,514,381 |
16 | 236.2M |
| Mexallon | 967,625 |
49 | 47.0M |
| Hydrocarbons | 157,239 |
443 | 69.6M |
Chromite — 547.6M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Hydrocarbons | 24,072 |
443 | 10.7M |
| Chromium | 96,286 |
6k | 536.9M |
Otavite — 262.1M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Atmospheric Gases | 23,111 |
166 | 3.8M |
| Cadmium | 92,445 |
3k | 258.3M |
Cobaltite — 19.3M / 30 days
| Material | Units / 30 days | Jita split | ISK / 30 days |
| Cobalt | 31,968 |
604 | 19.3M |
Step 4 — gross
| Refined material (all ores) | Units / 30 days | ISK / 30 days |
| Chromium | 96,286 | 536.9M |
| Cadmium | 92,445 | 258.3M |
| Pyerite | 14,514,381 | 236.2M |
| Hydrocarbons | 181,311 | 80.3M |
| Mexallon | 967,625 | 47.0M |
| Cobalt | 31,968 | 19.3M |
| Atmospheric Gases | 23,111 | 3.8M |
| Gross | 1,181,848,277 ISK |
Step 5 — Magmatic Gas fuel
40 / hr × 730 hr
= 29,200 units × 2k
= 52,355,600 ISK / 30 days
Step 6 — floor
| Gross | 1,181,848,277 ISK |
| − Magmatic Gas fuel | −52,355,600 ISK |
| Model floor | 1,129,492,677 ISK / 30 days |
| Floor used by the auction |
1,129,492,677 ISK / month |
Step 7 — what a bidder pays
| Term length | 3 months |
| Minimum monthly bid | 1,129,492,677 ISK (the floor) |
| Prepaid to the alliance on winning |
bid × 3 — at the floor, 3,388,478,032 ISK |
| Viability floor |
300,000,000 ISK / month —
clears it
|
From ~8,760,000 m³ of moon ore over 30 days. Prices are Jita,
16 min ago. Every input is on the settings page.
No auction open right now.